TOC — Thomas Oil CompanySublimate Technologies
Louisville, Kentucky · The integrated machine & fluid program

Clean before
you charge.

Dry-ice machine cleaning, sump service and fresh coolant, coordinated around one maintenance window. Keep the system performing with ongoing fluid care.

One coordinated changeover. One maintenance window.
See the machine side.CNC tool magazine, cleaned in place.
Louisville, Kentucky

A coordinated reset for your Louisville shop.

For machine shops in the Louisville, Kentucky market, build the plan around the way your facility runs: the machines and shifts involved, the current coolant issues, and the maintenance windows available. Share your location and priorities so TOC can review a practical service scope.

Plan the work around your machines and maintenance window.

The fluid and the machine

Two specialists. One coordinated changeover.

Fresh coolant needs a prepared machine. Thomas Oil and Sublimate Technologies coordinate the work around your maintenance window, from machine cleanout to fresh coolant and ongoing care.

The fluid program

Evacuate, clean the fluid system, charge and monitor.

  • Spent-fluid evacuation, sludge removal and waste service
  • System cleaner, drain and rinse per the fluid maker's procedure
  • Fluid selection, source water, concentration and recharge
  • Oil analysis, dipslides, top-off logs and ongoing monitoring as scoped
  • The TOC representative your team works with
Sublimate Technologies
The machine

Remove what the fluid can't.

  • Dry-ice cleaning of the emptied tank and accessible lines
  • Chip conveyor, enclosure, windows and way covers
  • Hydraulic-unit exteriors and approved machine surfaces
  • Panels de-energized and locked out, with scope confirmed first
  • Before-and-after photos and surface-condition documentation
Clean the machine before the new fluid

A clean start is more than a fresh charge.

Residue, chips, sludge and tramp oil belong in the changeover conversation. Replacing coolant does not by itself remove buildup from the machine. Physical cleaning prepares the approved surfaces before the system-cleaner stage and refill.

Precision steel plate, half cleaned.
See the surface.Precision steel plate, half cleaned.
Clean the accessible machine surfaces.Coolant tank valve and sump wall.
The changeover, in order

Four steps. Two companies.

Physical cleaning first, system cleaner second, fresh fluid last. Confirm the sequence, machine suitability and fluid maker's procedure before the maintenance window begins.

STEP 0 · THOMAS OIL

Evacuate & haul

Evacuate the spent fluid and sludge. Confirm waste handling and leave the machine ready for the agreed cleaning scope.

STEP 1 · SUBLIMATE

Clean in place

Clean the empty tank, accessible lines, conveyor, enclosure, windows, way covers and approved panels. Document condition before and after.

STEP 2 · THOMAS OIL

Run the system cleaner

Circulate the system cleaner per the fluid maker's sheet, then drain and rinse according to the approved procedure.

STEP 3 · THOMAS OIL

Charge & monitor

Charge the new fluid. Agree on the baseline dipslide, follow-up checks at day 7 and day 30, and a 30-day top-off log.

Then keep the system on a routine.

Train operators on mixing, concentration, top-offs and checks. Review machine condition with the fluid data, and coordinate the next cleaning around contamination and production needs. Recurring machine care is scoped separately for the assets your facility selects.

What we measure · What actually changes

Let your production data make the decision.

Document machine condition before cleaning and coolant performance before the reset. Trend the same measures afterward, recording which services and operating practices changed so the comparison stays useful.

MeasureBefore ResetAfter ResetDecision Metric
Fluid checks & top-off logAgree on a day-0 baseline and sampling procedureDipslides at day 7 and day 30; top-off log for 30 days, as scopedReview the trend with TOC against the agreed starting condition
Machine cleanliness & maintenance accessPhotograph priority areas and record buildup or access problemsDocument condition after cleaning and during operationCondition, maintenance access and observed time between cleaning needs
Coolant consumption / top-offsBaseline gallons per week and top-off frequencyTrack actual top-offs and additions% change in consumption and frequency
ConcentrationDocument the current operating rangeTrend refractometer readingsAssess stability
Tool lifeParts per edge or tool where applicableTrack the same operationParts per tool change and performance comparison
Sump condition & useful lifeDocument age, dump frequency, tramp oil, odor and appearanceInspect and trend condition and interventionsUseful life and intervention change
Quality / corrosion / rust / stainingDocument current issues and conditionMonitor parts and machineCompare outcome and observed result
Foam / residue / odorDocument current conditionMonitor in productionCompare the observed result
WasteDocument dump and change frequencyTrack waste eventsEvaluate the reduction opportunity
Operator feedbackCapture baseline comments and current experienceCollect trial feedbackCompare usability before and after
See the opportunity

The fluid numbers.
The machine numbers.

See what better coolant management and a coordinated machine cleanout could mean for your operation. Start with your shop numbers, then build the plan with TOC.

THOMAS OIL · FLUID SIDE

What is the coolant program costing you?

Concentrate, top-offs, fluid and waste from sump changes, tooling and tool-change impact belong in the coolant calculator.

Open the TOC Coolant Calculator ↗

Beta · enter your shop's actual operating data.

MACHINE CLEANING · COST & TIME

What does each cleaning event cost?

Estimate teardown, cleaning, waiting, labor and consumables on the dedicated machine-cleaning calculator page. Compare one changeover or a recurring machine-care plan.

Open the Machine Cleaning Calculator ↗

Example inputs · service-cost fields stay blank until you enter a quote.

Two views of the same opportunity. Review fluid consumption, tooling, cleaning labor and machine time with your TOC representative. Use the same labor rate and machine value in both calculators.
Test the coolant within the program

Prove the fluid plan on your production floor.

Put the program to work on your machine, with your parts, tooling and operators. Track the results with your TOC representative.

TOC FLUID TRIAL · SHIPPED

Prefer a shipped trial?

You can still test a better coolant. TOC can support shipped trials throughout much of the U.S., with next-day shipping available to many locations.

  • Application and chemistry review
  • Trial coolant shipment
  • Baseline guidance and tracking template
  • Remote technical support
  • Performance review after the trial
Apply for a Shipped Trial

Your TOC representative will coordinate product delivery and startup support for your shop.

Louisville · System review request

Louisville: plan your machine reset.

Tell us what needs cleaning, what the coolant is doing, and when the machine can be available. We will review dry-ice cleaning, sump service and ongoing coolant control as one coordinated scope.

How we build the plan

  1. We connect you with the right TOC representative.
  2. We review the machine, material, water and current coolant.
  3. We review machine access, contamination and the reset scope.
  4. We agree on what success will be measured against.
  5. Your TOC representative coordinates the service plan and maintenance window.

Your TOC representative will coordinate the machine-cleaning and coolant plan around your production goals.

Start with the machine you have

Build a plan that lasts beyond cleaning day.

Bring the machine condition, the coolant baseline and the maintenance window. TOC can help define the next steps.

Plan Your Machine Reset
Start with TOC

Put your machine-care plan in motion.

YOUR MACHINE & FLUID PROGRAM

Thomas Oil Company

Planning work in the Louisville, Kentucky market? Start with your TOC representative and confirm the facility location, service scope and timing.

Request a TOC System Review